Focused on Efficiency, Safety and Sustainability across Every Stage of Our Operations.
Project Name
Parasea–Belbaid Reorganisation Underground Coal Mine
Authority
Eastern Coalfields Limited (ECL)
Operator / SPV
Parasea Coal Mine Project Private Limited
(A wholly owned subsidiary of Gainwell Commosales Private Limited)
Project Area
~ 784 Hectares
Extractable Reserves
35.62 Million Tonnes
Peak Capacity
2.07 MTPA
Project Duration
25 years
The Parasea–Belbaid Reorganisation Underground Coal Mine project marks an important milestone in the modernization of underground coal mining in India. The project was awarded to Gainwell Commosales Private Limited by Eastern Coalfields Limited in March 2023 for the development and operation of the mine over a 25-year period.
To execute the project, Parasea Coal Mine Project Private Limited (PCMPPL) was incorporated in June 2023 as a dedicated Special Purpose Vehicle responsible for the planning, development and operation of the mine.
The project integrates underground mine development, surface infrastructure creation and supporting systems necessary to enable safe and efficient mining operations.
The project involves the development of extensive underground and surface infrastructure, including the construction of two mechanized inclines of approximately 1,600 metres each with a gradient of 1 in 4.5, making them among the longest incline drivages in India’s underground coal mining sector. The development scope also includes new airshaft sinking upto a depth of 335m, deepening of the existing shaft, construction of power supply infrastructure including 33 kV/6.6 kV main substations, and development of water management systems including one of the longest jore diversions in the region.
Coal extracted from the underground workings will be transported through a surface belt conveyor system to the Parasea Railway Siding, enabling efficient, streamlined, and dust-controlled coal evacuation.
View Gallery
View Gallery
View Gallery
Our unyielding commitment to our people and the environment underpins every decision and action at the Parasea–Belbaid project.
Safety is the foundation of all our project activities. The Parasea–Belbaid project promotes a strong safety culture through proactive hazard identification, risk management, continuous monitoring of workplace conditions, and regular training programs to protect the health and wellbeing of all personnel.
Proactive identification and elimination of workplace hazards before they escalate.
Structured risk assessment and control processes strictly aligned with industry best standards.
Real-time scrutiny of workplace environment, ventilation parameters, and underground gas thresholds.
Ongoing immersive safety and rescue training programs to ensure complete readiness.
The Parasea–Belbaid project integrates mine water treatment, responsible drainage management, dust and air quality control, proper waste handling, and energy-efficient infrastructure, supported by continuous monitoring of ventilation, underground gases, etc and compliance with environmental regulations to ensure responsible and sustainable mining operations.
Responsible extraction, extensive treatment, and reuse of mine drainage water to eliminate environmental contamination and preserve local water tables.
State-of-the-art dust suppression and continious air quality monitoring throughout our underground operations.
Methodical handling, segregation and responsible disposal of all waste materials generated during our operations.
For more information about our operational approach, safety practices, project execution standards, or community initiatives, please connect with our team.
Contact Our TeamFrom Vision to Value -
Create Impact with PCMPPL
Uncompromising adherence to international safety standards and protocols.
Efficiency-driven operations that optimize output and minimize overhead.
Highly skilled workforce trained in the latest mining technologies.
Our team works around the clock to ensure that productivity meets environmental responsibility. We don't just mine; we build the foundations of future growth.
Get In TouchUnit 402, 4th floor, Godrej Genesis Building, Street 18, Block EP&GP, Sector 5, Bidhannagar, Kolkata - 700091